Railway Museum of San Angelo
This page was last updated on: September 7, 2017
O Gauge
Model Railroad Layout

New Tunnel Was Added Before Final Foreground Finished
Three Loops Merge Near Switch Tower
Ballinger Depot Track Side With Two Trains Coming In
Ballinger Depot Street Side
Heading Into Tunnel By West Side Depot
Crossing At Dry Gulch Trestle
Inside Track Passes Coaling Tower While Outside Goes Through It Side Track Hold Waiting Trains